Markets

The same factory quote lands differently in Rotterdam, Los Angeles, Singapore and Jebel Ali.

Duty, certification, labelling, transit and payment culture change by market. We price and document for the destination, not just the origin.

Rotterdam container port at blue hour

We serve four regions where we have supplier, logistics and insurance experience. We do not claim to be everywhere. If your destination is outside these markets, ask — we will tell you whether we can support it properly.

Europe

CE, REACH, GPSR, EPR and VAT. DDP available in selected lanes.

North America

Tariff modelling, FDA/FCC/CPSC where relevant, ISF and customs bonds.

Southeast Asia

Country-specific certification, shorter transit, consolidation in Singapore.

Middle East

SASO/Saber for Saudi, ESMA for UAE, Arabic labelling and project logistics.

Country guides

  • Germany — CE, GPSR, VerpackG/LUCID, import VAT and Hamburg/Bremerhaven routing.
  • Netherlands — Rotterdam gateway, Article 23 VAT deferral, EPR and EU distribution.
  • United Arab Emirates — Jebel Ali, ESMA/ECAS, 5% VAT and re-export structuring.
  • France — CE/GPSR, AGEC/EPR, French labelling and Le Havre or Marseille routing.
  • Spain — CE/GPSR, Ecoembes packaging EPR, Spanish labelling and Valencia/Barcelona.
  • Saudi Arabia — SASO/Saber, Arabic labelling, Jeddah and Dammam routing.
  • United States — HTS, Section 301 exposure, FDA/FCC/CPSC, ISF and customs bond coordination.
  • Singapore — TradeNet, 9% GST, controlled-goods marking and regional re-export.
  • Canada — CBSA/CARM, GST/HST, bilingual labels and provincial electrical marks.
  • Vietnam — Form E, 10% VAT, Vietnamese labels and CR marking.
  • Malaysia — SST, SIRIM, Halal and Bahasa labels, with Port Klang/Penang routing.
  • Italy — 22% VAT, CE/GPSR, CONAI packaging and Genoa/La Spezia routing.
  • Poland — 23% VAT, BDO packaging and Gdansk/Gdynia rail-and-sea routing.

Last updated 18 November 2026. Figures are indicative and confirmed in writing after scoping.

Next step

Send the product list. We will send the plan.

Tell us what you buy, the annual volume and where it ships. You will get a sourcing approach, a landed-cost view and the payment terms we can support — usually within one business day.

What happens next

  1. 1We read the brief and confirm fit.
  2. 2We send a scoped proposal with fees and terms.
  3. 3You approve; we start sourcing.
Request a quote Chat on WhatsApp

No obligation. We will tell you if we are not the right fit.

WhatsApp us