Most buyers do not need a programme on day one. They need one verified order, a clean file and a supplier they can repeat. The programme becomes worth it when the volume, the supplier count and the cash cycle are large enough that a 1–3% fee is smaller than the cost of getting it wrong.
Tick the statements that apply
Tick the statements above to see a starting point.
What each band usually means
| Score | Starting point |
|---|---|
| 0–2 | Start with one verified order. Pay on cash or a normal deposit; the fee is 3–5% per project, and the first job is the entity check, the spec and the inspection. |
| 3–5 | Build the file before the terms. Repeat orders and multiple suppliers justify consolidation; 30–90 days may be possible with underwriting. |
| 6–8 | A programme is worth modelling. Multi-supplier, insured 30–180 day terms and a 1–3% fee can be smaller than the cash and risk cost of doing it alone. |
Last updated 18 November 2026. Figures are indicative and confirmed in writing after scoping.