A 90-day term usually matches one inventory turn: goods arrive, sell through, and the payable falls due. A 30-day term suits fast-moving categories with a short production cycle. The right answer depends on your inventory, not on the longest term available.
| Term | Typical use | Deposit | Indicative all-in cost |
|---|---|---|---|
| 30 days | Fast-moving, short production cycle | 20%–30% | 2.5%–3.5% of order |
| 60 days | Standard replenishment | 20%–30% | 3.0%–4.5% |
| 90 days | One inventory turn, seasonal build | 20%–30% | 4.0%–6.0% |
The all-in cost includes the annual procurement fee, funding and insurance; the exact split is on every quote. The range moves with order size, destination and the insurer's rate.
What we need to start
- A completed buyer questionnaire and latest accounts.
- One or two supplier quotes for the first order.
- A deposit of 20%–30% at order confirmation.
- A destination and Incoterm so we can model landed cost.
Last updated 18 November 2026. Figures are indicative and confirmed in writing after scoping.