Poland is a manufacturing base, a consumer market and the rail gateway into Central Europe. The import file is European first: EORI, VAT, CE and packaging EPR. Then come the Polish label, the port and the inland leg. A landed cost that stops at Gdansk is not a landed cost.
What Polish buyers ask us to fix
- EORI, VAT and importer details checked before the vessel leaves China.
- CE, GPSR, REACH, RoHS and WEEE files that match the exact model and factory.
- BDO packaging registration data and Polish labels, built into production rather than added at the warehouse.
- Gdansk, Gdynia or the rail route via Malaszewicze compared door-to-door.
- A payment structure that does not tie up cash for the full production and transit cycle.
VAT and the import file
The standard Polish VAT rate is 23%, with reduced rates for specific goods. Import VAT is charged on the customs value plus duty; recovery or deferral depends on your Polish entity and fiscal adviser. We show VAT as its own line, separate from duty and our fee, so the comparison with your broker is honest.
Conformity, packaging and labels
| Area | What to check before shipment |
|---|---|
| Electrical / electronic | CE marking under LVD/EMC, RoHS, WEEE and battery registration where applicable, plus Polish importer details on the label. |
| Machinery | Machinery Directive and related CE requirements, risk assessment, Polish manual and safety warnings. |
| Packaging | BDO registration and packaging data for the materials placed on the Polish market; the importer is responsible for the registration. |
| Consumer labels | Polish language for instructions, warnings and importer details where required; food contact and toy rules are separate. |
| Wood packaging | ISPM 15 treatment and marking for crates and pallets. |
Logistics
Gdansk and Gdynia are the main Baltic gateways; Szczecin serves the west. Rail from Gdansk through Malaszewicze reaches Warsaw and Central Europe quickly, but the border procedure and the inland cost have to be compared with road. Transit from Shanghai or Ningbo is typically 30–35 days. We quote port, rail and truck together.
Last updated 18 November 2026. Figures are indicative and confirmed in writing after scoping.