Furniture is one of the most common first categories for a new importer: visible product, clear specification and a price that can be compared. It is also one of the easiest categories to lose money in, because the cost is not only the unit price. Carton damage, moisture, colour variation, hardware shortages and a missing compliance file all land after the balance payment has left.
This guide covers the four things that decide whether a furniture order works: the real landed cost, the checks before production, the inspection that actually catches defects, and a payment structure that does not put the whole order at risk.
Why furniture is a cash and quality problem
A furniture order is usually bulky, slow to produce and expensive to ship. A single 40HQ container can carry several hundred units, so a small error in the specification becomes a large error in the warehouse. The cash cycle is long: deposit at order, balance before shipment, 30 to 45 days on the water, then stock sitting until it sells.
That is why the useful question is not "what is the FOB price per unit?" but "what is the all-in cost per sellable unit, and when do I get my cash back?" A supplier who is 8% cheaper but ships 5% damaged can be the more expensive supplier.
What the landed cost includes
| Line | What to check | Common mistake |
|---|---|---|
| FOB price | Unit price, carton quantity, carton dimensions and gross weight | Comparing a price without the carton specification |
| Freight | Volume, container utilisation and whether the quote is per CBM or per container | Assuming a full container is always cheaper than LCL |
| Duty | HS code for the actual material and function, not the product name | One HS code for a mixed container |
| Import VAT / GST | Cash paid at import, recoverable only if you are registered | Treating VAT as a cost or ignoring it as cash |
| Agent fee | Percentage basis and what is included | Comparing a fee with a unit price |
| Funding | Rate, day count and the amount advanced | Quoting a rate without the day count |
| Insurance | Insured limit, deductible and recourse | Assuming the supplier's insurance covers your loss |
| Port and inland | Terminal, broker, delivery and unloading | Stopping the calculation at the port |
Model the number before you commit. The cost calculator shows fee, funding, insurance and cash freed separately, so a cheap-looking quote can be compared with a complete one.
Five checks before production
- The licence matches the contracting entity. The company that signs the PI, receives the deposit and appears on the business licence should be the same entity. A trading company can be the right partner, but the price and the quality responsibility must reflect that.
- The factory can repeat the sample. Ask for a pre-production sample from the actual production line, not a golden sample kept for buyers. Confirm the material, finish, hardware and packaging.
- The specification is a document, not a chat. Dimensions, tolerances, fabric or leather reference, foam density, hardware brand, carton drop height and labelling must be written into the PI or an annex.
- Compliance is identified by market. EU furniture may need GPSR information, packaging EPR registration and material declarations; US upholstered furniture may need flammability and formaldehyde documentation. The supplier should name the test report and the model it covers.
- The payment path is verified. Bank account name must match the contracting entity. Any change of bank details is confirmed by voice on a known number, never by email alone.
Inspection that catches furniture defects
A generic "QC inspection" is not enough. For furniture, the inspection should include:
- Carton and packaging: drop test, compression, corner protection and moisture barrier. A furniture carton that fails in a container is a write-off, not a repack.
- Hardware and assembly: count the fittings, test the assembly, check that the instructions match the hardware and that spare parts are included.
- Finish and colour: compare against the approved sample under consistent light. Photograph every panel, not one hero shot.
- Moisture: wood and upholstery need a moisture reading; a container can sweat for weeks.
- AQL and the failure procedure: agree the acceptable quality limit, the sample size and what happens on a failed lot before production starts. Who reworks, who pays and who decides?
Use an inspection with a written report and photo evidence. See how pre-shipment inspection works.
Documents and compliance
The document file should include the business licence, the PI with Incoterms, the commercial invoice and packing list, the bill of lading, the certificate of origin if a preferential rate applies, and the product test reports. For the EU, check GPSR responsible-person details and packaging EPR; for the US, check the applicable CPSC, CARB/TSCA and state rules. A certificate for a "similar model" is not evidence for your SKU.
Payment structure
A common structure is 30% deposit and 70% before shipment, released after a passed inspection. That protects the supplier's material cost and gives the buyer a gate before the balance. For repeat orders, an insured open-account term can replace the balance payment: the supplier is paid earlier, and the buyer settles in 30 to 180 days. The funding cost and the insurance limit must be shown separately from the agent fee.
Do not use a long term to fix a bad purchase price. If the landed cost does not support the selling price, longer terms only make the loss slower.
A worked example
Assume a $120,000 FOB order, two 40HQ containers, 20% import VAT, 6% duty, a 3% agent fee, 90-day funding at 9% and 0.5% insurance. The fee is $3,600, funding is roughly $2,700 on the advanced amount, insurance is $600, and duty is $7,200. The goods are not "cheap" or "expensive" in isolation; the number that matters is landed cost per sellable unit after damage and returns.