The challenge
A mid-sized Dutch furniture importer was paying 30% deposits and 70% before shipment across three suppliers. Cash was tied up for 60–75 days before goods reached the warehouse, limiting the number of container programmes it could run at once. Two of the three suppliers shipped to different ports, so the company was also absorbing three sets of freight and destination charges.
What we changed
- Consolidated three suppliers into a single monthly 40HQ programme and one set of export documents.
- Added pre-shipment inspection for frame strength, finish and packaging, with photo and video reports.
- Moved the buyer to 90-day terms from bill of lading, with a 20% deposit and an insured limit.
- Built a landed-cost sheet per SKU, including duty and inland delivery, so margin was visible before the order was placed.
What happened
The importer moved from four to six container programmes per year without adding a credit line. The consolidated shipment cut destination charges and gave one inspection point. The trade-off was a tighter cargo-ready window: suppliers who missed it held the container, so the buyer now works to a shared calendar.